2nd floor office construction Bid Docs (*contractor walk through scheduled for 1/13/2025)

Attached are the bid docs for the construction of an office on the second floor of Village Hall.  

Bidders are encouraged to meet with the Building Inspector on January 13th, 2025, at 9:00am at the Village Hall for a walk through of the project site.